Oct 10
|
Brixton Metals Drills 41.00m of 1.08 g/t Gold including 6.00m of 4.19 g/t Gold all within 254.00m of 0.48 g/t Gold at its Trapper Target on the Thorn Project
|
Jul 25
|
Brixton Metals Provides Initial Assays from the 2024 Drill Program at its Thorn Project with 1467.73m of Copper-Gold-Silver-Molybdenum with Several Sub-intervals:
|
Jun 25
|
Brixton Metals Begins Drilling at its Cirque Copper Porphyry Target
|
Dec 4
|
Brixton Metals Appoints Jason Shepherd as VP Investor Relations
|
Dec 1
|
Brixton Metals Drills 76.50m of 1.08 g/t Gold within 179.50m of 0.51 g/t Gold and 54.00m of 1.03 g/t Gold within 149.00m of 0.55 g/t Gold at its Trapper Target on the Thorn Project
|
Oct 24
|
Brixton Metals Yields up to 33% Copper and 39 g/t Gold from 2023 Surface Sampling Results at the East Target and South Target, Thorn Project
|
Oct 21
|
Here's Why Brixton Metals (CVE:BBB) Must Use Its Cash Wisely
|